Portfolio

Brooks-Howell Home

Brooks-Howell Home is owned and governed by United Methodist Women of The United Methodist Church. A local board supports the […]

58 Broadway

58 Broadway was a renovation project that consisted of one retail space at street level and 5 efficiency units above. […]

700 Biltmore Avenue Phase III

The Village at 700 Biltmore consists of a Hotel Reception Building and Restaurant. The schematic design phase is completed.

Central United Methodist Church

Addition to existing Central United Methodist Church. The existing Church complex was constructed in several phases beginning with the […]

Dixon Hughes Goodman

The renovation is to DHG’s 27,000 sf flagship facility. It’s the central office for their accounting offices across the Southeast […]

700 Biltmore Residences

The Residences at 700 Biltmore is the conversion of a 1960’s era apartment complex into a residential condominium and guest […]

Habitat House

Asheville Area Habitat for Humanity (AAHH) incorporated in 1983 under the name of Western North Carolina Habitat for Humanity making […]

Mars Hill PreK-5

Construction completed 2001, $5.6M budget.
57,000 SF new construction; including 22 new classrooms; art, music, computer and resource spaces; media center, […]

Feasibility Study for the Renovation of 28 N Lexington Ave

The building is located between North Lexington Avenue and Broadway Street and is a mixed use infill building with nineteen […]

Ravenscroft

Urban mixed-use project located in the South Slope area of Downtown Asheville

The Urban Design Concept of the project is to […]

32 Broadway

The Jenkins Building at 32 Broadway in Downtown Asheville was originally constructed in 1912 and is a contributing building to […]

Swain County Schools

The proposed project consists of multiple additions and renovations to Swain County High School. The cafeteria, office and main […]

64 Broadway

64 Broadway is located on the edge of Downtown Asheville’s Historic District. The building is composed of a retail space […]

Emma Elementary School

Opened to students in August 1996, on schedule.

61,000 square foot project includes new classrooms, offices, cafeteria & assembly hall and […]